The next and hopefully last major milestone to get the Certificate of Occupancy is a working Septic system. Francois used his manly tools to help uncover the holding tank and inspection ports. I called Ternoois, to see about the inspection. She was familiar with the process of working with the town, so that all sounded good to me. I gave her the address, and told her that according to my hand written notes they were the last to clean it out, and actually were the original installers.
Lady: Oh thats good, at least we know it was done right
Me: Yep, thats why I called you
Lady: So do you know who owned it before you?
Me: Hotchkiss
Lady: Laughing... oh if you look under the sink it says Ternoois.
Me: Doubtful
Lady: Oh no I wrote it there
Me: Really?, well the bathroom has been changed, so you won't find it there.
Lady: We used to own that cottage.
Me: Wow small world. I checked out my earlier post about the ownership and indeed Ternoois owned it prior to Hotchkiss.
Lady: Will it be difficult to get our trucks hose to the tank?
Me: Nope, drive in like you own the place and the tank is right there.
Lady: Thats good, we did one a couple weeks ago on the island, used like 200 feet of hose, it was a terrible job. Just down the rode from you, Jack McGuire. It was really hard to do. Did another McGuire too, it wasn't near as bad as Jack's.
Me: I am sure there was a lot to pump out.